postcalendar

Publish

12 April 2018

postcaticon

Category

Blog

postreadingicon

Read

1 min

MISKAR FIELD  – BIBBY POLARIS at Malta – 10.04.2018.


The 1998 built British flagged (GBR) Multi Purpose Supply Vessel (MPSV)  BIBBY POLARIS entered Valletta (Grand Harbour), Malta for the first time on Tuesday 10th April, 2018 for mobilizing at the Mediterranean Maritime Hub (MMH) before proceeding to Miskar Oil Field, offshore Tunisia.

The MISKAR FIELD is a natural gas field located in the Gulf of Gabes, Tunisia. It was discovered in 1975 and developed by BG Group, a British multinational oil and gas company headquartered in Reading, UK. It began production in 2006 and produces natural gas and condensates. 

Below are some images of BIBBY POLARIS  entering Valletta last Tuesday 10th April – 





Vessel was represented in Malta by SMS Shipping (http://www.sms.com.mt)



Photos by Capt. Lawrence Dalli. Do not use these images without my permission. © All rights reserved. Malta Ship Photos & Action Photos – www.maltashipphotos.com


All Photographs with others in archives are AGAINST PAYMENT so feel free to email us with your requirements.

Watermarked Photos are by Capt. Lawrence Dalli otherwise stated. NO PHOTOS can be used or manipulated without our permission.
© All rights reserved. Malta Ship Photos & Action Photos – www.maltashipphotos.com