BEZZ V – 14.11.2024

Towed by 46 with an excavator onboard
Bezz III – 04.10.2023

During Ras Hanzir Area Extension
Gold Dredger – 27.09.2024

Returning back to berth
Seadragon – 17.07.2023

Entering Valletta towed by SEAWOLF II
Lesvos I – 29.05.2012

2nd unit of CMS SEALION towage
Cobra – 11.01.2024

Dredging works
Bezz V – 26.09.2023

Part of the Project
Seadragon – November 2021

1987 built crane barge during Inert Material Dredging Ops
Gold Dredger – 30.04.2021

1968 built vessel leaving Valletta
Gold Dredger no 2 – 21.02.2019

During Jetty repairs