Tristao Da Cunha no 2 – 08.03.2020

Maiden call whilst berthing at Pinto 2 wharf
Tristao Da Cunha no 1 – 08.03.2020

2019 built TSHD during her maiden call
Lady Sandra – 13.09.2014

19814 built dredger awaiting sales
Baliena

Various images of the only local owned bucket dredger
Athena – 16.03.2019

2011 built Cutter Suction Dredger berthed at Palumbo Malta Shipyard Ltd
Bezz I – 15.05.2018

Loaded with sewage water treatment bound to LNG FSU
San Luca Primo – 08.12.2018

Leaving Valletta on a dull day
San Luca Primo – 05.12.2018

Berthed at Wine Wharf
D’Artagnan – 14.08,2018

Mobilising for her next assignment
San Luca Primo no 2 – 24.11.2017

Placing boulders loaded from Pozzallo