A5347 ITS Gorgona – 11.01.2024

Berthed at Porto Commerciale
A 514 FGS Werra no 2 -23.09.2016

Part of Operation Sophia
A 514 FGS Werra no 1 -23.09.2016

Leaving Valletta from Boiler Wharf
L 17 HDMS Esbern Snare no 2 – 26.09.2013

Berthing at Pinto 4 and 5 wharves
L 17 HDMS Esbern Snare no 1 – 26.09.2013

Entering for the first time
A 621 FS Rhin – 24.11.2018

Bound to demolishing towed by MULTRASHIP 20
A04 ESPS Martin Posadillo – 24.02.2012

Leaving Valletta from Pinto Wharf
A 05 ESPS El Camino Espanol no 2 – 14.04.2017

Bound to berth at Pinto 3
A 05 ESPS El Camino Espanol no 1 – 14.04.2017

1984 built vessel entering Valletta
A 515 FGS Main – 22.12.2016

Entering Valletta for Pinto 4 Wharf