ConRo News – Grimaldi’s Hybrid RoRo ECO CATANIA at Malta – 26.07.2021
The Fifth ship from a class of twelve hybrid vessels of the innovative Grimaldi Green 5th Generation (GG5G) class the ECO CATANIA entered Grand Harbour, Malta during her maiden call on Monday 26th July berthing at Laboratory Wharf. At 1930 hrs she was ready to shift to Palumbo Malta Shipyard floating at Dock no 6 to minor […]