Anchor Weekly News – 1st to 9th March 2025.

Stay up to date with the latest maritime shipping news introducing weekly ship movements/maritime projects. Saturday 1st March. First shipping movement at Valletta was the arrival of the 2017 built tug ST ANGELO that passed breakwaters at 0559 hrs wearing fresh MedTug livery from Augusta, Sicily after she was drydocked. More images here – St. […]
Malta Naval Visits – February 2025

Monday 3rd February. The Royal Navy Batch 2 River Class Offshore Patrol Vessel (OPV) HMS TRENT P 224 shifted from Hamilton Wharf North to South in front of Dock 3 with pilot onboard at 0830 hrs. More images can be found here – P224 HMS Trent – 12.02.2025 – Malta Ship Photos & Action Photos The […]
Ship Repair – Repetitive Yacht SEAGULL II at Bezzina Ship Repair Yard, Malta from 2024 to 2025 – 27.02.2025

Bezzina Ship Repair Yard (BSRY) is a complete Ship and Yacht repair facility for vessels of steel, aluminium, CRP and wood. It is a privately family owned and situated at Coal Wharf, Grand Harbour inner side. With 2 former Admiralty reinforced concrete floating docks (RCFD) of which lately they were refurbished, repetitive and new clients […]
Malta Naval Visits – January 2025

Friday 3rd January. The Marina Militare Italiana (Italian Navy) Bergamini Class Anti Submarine Frigate (FREMM) ITS ALPINO F 594 left Valletta passing breakwaters at 1031 hrs bound to the Mediterranean Sea to form part of Mare Sicuro Deployment. More images can be found here – https://maltashipphotos.com/photo/f-594-its-alpino-03-01-2025/ Monday 6th January. The Royal Navy Batch 2 River Class […]
Malta Naval Visits – December 2024

Tuesday 3rd December . The Royal Fleet Auxiliary (RFA) Dock Landing Ship RFA MOUNTS BAY L 3008 left Valletta passed breakwaters at 1422 hrs assisted by 2 tugs from her berth at Pinto 1 and 2 wharves. (On another note she arrived home on Wednesday 18th December after she stopped at HMNB Gibraltar for few days) […]
Malta Naval Visits – November 2024

Friday 8th November . The Hellenic Navy Elli Class ( Based on Kortenaer Class) Frigate HS LIMNOS F 451 ( Φ/Γ Λήμνος ) entered Valletta during her maiden call passing breakwaters at 1036 hrs. Monday 11th November . The Hellenic Navy Elli Class Frigate HS LIMNOS F 451 ( Φ/Γ Λήμνος ) left Valletta from her […]
Palumbo Malta Shipyard – Chemical/Oil Tanker LUCA IEVOLI from 11.10 to 14.10.2024

In the afternoon of Friday 11th October the 2002 Italian built and owned chemical/oil tanker LUCA IEVOLI was seen passing Grand Harbour breakwaters at 1539 hrs assisted by 1 tug WENZINA. She was built by Cantiere Navale Morini at Ancora with yard no 275 as the double hull tanker LUCA IEVOLI with 1 x Wartsila […]
Palumbo Malta Shipyard – HHI built LNG tanker COOL RIDER from 22nd August – 24th September, 2024

On Thursday 22nd August the 2007 built LNG gas carrier COOL RIDER was seen approaching Malta when ONLY the workboat SEA EXPRESS II with chemist aboard notified Valletta VTS that she has a conveyance with her and VTS responded that they had nothing on her since she didn’t communicate though she had entered Territorial Waters. […]
Palumbo Malta Shipyard – Tsakos tanker ALASKA from 26th May to 27th June 2024

After 24 days since the departure of Tsakos Energy Navigation (TEN) crude oil tanker ARCHANGEL, it was time to see another Hyundai Heavy Industries (HHI) build, this time the ALASKA homeported at Majuro (MHL Flag) too. She passed breakwaters at Grand Harbour on Sunday 26th May at 1248 hrs assisted by 4 tugs and berthed […]
Towage – CMS Sealion towing tug AIAS and crane barge LESVOS I – 29.05.2012

After another towage was done (Flat top barge SANTORINI III) during May, 2012 from Tripoli, Libya , the 1974 built MLT flag and owned tug CMS SEALION arrived at Grand Harbour, Malta with 2 more maritime assets for drydocking at Palumbo Malta Shipyard on Tuesday 29th May, 2012. CMS SEALION was built in 1973 by Richards […]