Towage – FAIRMOUNT SUMMIT towing semi-submersible heavy lifter GAVEA LIFTER loaded with jack up oilrig WEST TITANIA – 13.06.2007
On Wednesday 13th June 2007, the 2005 built 75 metre anchor handling tug FAIRMOUNT SUMMIT towing the 1976 built 196 metre non propelled semi submersible heavy lifter GAVEA LIFTER loaded with the 1981 built jack up oil rig WEST TITANIA loaded from Congo, West Africa entered Grand Harbour around 1346 hrs. 4 Tug Malta tugs […]