Dredging – Second Call for GRANE R at Valletta – 02 – 04.09.2022
Infrastructure Malta has commenced dredging works to help improve safety and navigability inside Grand Harbour using the the 2010 built DP 2 multi purpose offshore vessel GRANE R that entered Grand Harbour on Friday 2nd September at 0640 hrs. The project aims to remove tonnes of silt and other sediment from the seabed in the […]
Dredging – GRANE R dredging inner part of Grand Harbour – August 2022
After nearly a month anchored at Bunkering Area 3, the 2010 built DP 2 multi purpose offshore vessel GRANE R entered Grand Harbour on Friday 12th August originally coming from Viana do Castelo at Portugal of which she passed breakwaters at 0839hrs. Transport Malta issued Local Notice to Mariners no 136 regarding the dredging works […]