Delivery – 2024 newbuilt Hybrid Double Ended Ferry PIETRO MONDELLO at Malta – 14.12.2024

The 2024 newbuilt Hybrid double ended ferry PIETRO MONDELLO entered Valletta, Malta on Sunday 14th December at 1638 hrs from her builders – Sefine Shipyard in Turkey (Left Turkey on Wednesday 11th December) bound to Palumbo Malta Shipyard Ltd, berthing at Factory Wharf. Designed by Norwegian naval architecture firm LMG Marin, the vessel was named […]
Delivery – Service Operation Vessel (SOV) GRAMPIAN TEES at Malta – December, 2023

Last Thursday 21st December, 2023 the North Star Group Hybrid Electric Service Operation Vessel (SOV), GRAMPIAN TEES called at Grand Harbour, Malta at 1730 hrs (1630 UTC) berthing at Pinto 3 Wharf for crew change, uplifting bunkers and stores/provisions. She’s the third vessel in a series of four destined for decade-long minimum charters to […]
Delivery – Service Operation Vessel (SOV) GRAMPIAN DERWENT at Malta – August, 2023

Last August 2023 the North Star Group Hybrid Electric Service Operation Vessel (SOV), the second vessel in a series of four – GRAMPIAN DERWENT called at Grand Harbour, Malta berthing at Pinto 3 Wharf for crew change, uplifting bunkers and stores/provisions. The DNV classed vessel , which is the largest from the class of four […]
Delivery – Service Operation Vessel (SOV) GRAMPIAN TYNE at Malta – April, 2023

Last April 2023 the North Star Group Hybrid Electric Service Operation Vessel (SOV), the first vessel in a series of four – GRAMPIAN TYNE called at Grand Harbour, Malta berthing at MMH Facilities for crew change, uplifting bunkers and stores/provisions. The DNV classed vessel with 79.9 metres loa, a moulded beam of 19 metres, a […]