Casualty – NS PRIDE aground at Greece – November 2024

During the last days of  November 2024 the German built general cargo ship NS PRIDE ran aground at Greece without injuries and damage. She was on her way to Malta but once she was free, the Greek Authorities boarded her at the Port of Patras for inspection including water ingress etc of which 11 Deficiencies […]

Cars Transhipment – Vessels HOEGH BERLIN, SEA CARYATIS and SEA PATRIS – Q3 of 2024

Transhipment refer to logistics and transportation to facilitate the transfer of cargo or goods from one mode of transportation to another and is a fundamental component of intermodal transportation, where cargo is transferred between of which Valletta Gateway Terminals (VGT) boosts exceptional car compound facilities located at Laboratory Wharf The second Car Equivalent Unit (CEU) transhipment […]

Malta Naval Visits – October 2024

Tuesday 1st October.  The Hellenic Navy Elli Class ( Kortenaer Class) Frigate HS NIKIFOROS FOKAS F 466 ( Φ/Γ Νικηφόρος Φωκάς ) left Valletta after passing breakwaters at 0906 hrs. She was due to leave before but due to strong wing her diplomatic clearance was extended. More images can be found here – https://maltashipphotos.com/photo/f-466-hs-nikoforos-fokas-01-10-2024/ Thursday 3rd […]

Maiden Call – 2006 built tug LEDRA DYNAMIC at Malta – 19.07.2024

On Friday 19th July, 2024, the Malaysian built 37 metre tug LEDRA DYNAMIC was seen entering Valletta, passing breakwaters at 0651 hrs with her deck loaded with a set of yokohama fenders. She was built at Piasau Slipways Sdn Bhd which is an enterprise in Malaysia, with the main office in Jelutong as Hull no 217 with […]

Yacht Transport – Symphony Star discharging Sunseeker yacht at Malta – 22.04.2023

The 2015 German built Ecobox Multi-Purpose Vessel SYMPHONY STAR called to Valletta, Malta on the late morning of Saturday 22nd April, 2023. More images can be found here –  https://maltashipphotos.com/photo/symphony-star-22-04-2023/ On Completion of berthing including tug assistance from tug SEA SALVOR, preparations started to discharge the Sunseeker 100 Yacht More images can be found here […]

Harbour Facilities – Ras Hanzir Project, Malta – 29.02.2024

During Q 4 of the year 2020 it was announced that a new wharf for cargo will be built at the Ras Ħanżir area,  part of Grand Harbour , a project that will cost €65 million, partially funded by the EU Cohesion Fund. The Planning Authority File No : PA/08472/19 with ERA Reference EA/00042/19 is […]